Ochsner West Tower COVID Expansion
Creative Solutions Delivered with Urgency
Project Size
79,875 SF
3 Stories
Project Duration
July 2020
100 Days
Owner
Ochsner Health Systems
Architect
Rozas Ward Architects
The second West Tower Build Out was an emergency response to the COVID-19 pandemic. Broadmoor overcame the logistical challenges of working above the occupied ICU levels, maintaining the ambulatory access road, and protecting the health of our team, patients, and hospital staff. Broadmoor created a three-floor construction plan and a 24-hour construction schedule in seven days. Value Engineering prioritized safety and phasing; experience from the initial West Tower Expansion (2019) guided preconstruction and operational efforts. Our team pushed through constant uncertainty to provide the community with imperative resources.
Recognition & Awards
2020 Excellence Award
ABC Bayou Chapter